Sector · UK public sector

Tenders in Construction work for airfields, runways and manoeuvring surfaces

Live UK public-sector tender data, scoped to Construction work for airfields, runways and manoeuvring surfaces. 3 awards we have tracked, with the suppliers winning and how the spend distributes.

3

awards tracked

£28m

total contract value

£9.3m

average award size

0%

awarded to SMEs

Recent awards

Latest tenders awarded by Construction work for airfields, runways and manoeuvring surfaces

  • RAF Waddington AOS - RIBA W/S 3-4 - Design Contract

    Awarded to LAGAN CONSTRUCTION LIMITED on 28 Sept 2025 · MINISTRY OF DEFENCE

    £3.8m

  • RAF Brize Norton AOS - RIBA W/S 4 - Design Contract

    Awarded to VOLKERFITZPATRICK LIMITED on 23 Sept 2025 · MINISTRY OF DEFENCE

    £23m

  • RAF Brize Norton AOS - RIBA W/S 4 - Technical Support Provider

    Awarded to Aecom on 18 Sept 2025 · MINISTRY OF DEFENCE

    £1.1m

Sector pulse

Who procures in Construction work for airfields, runways and manoeuvring surfaces, and where the value sits

Construction work for airfields, runways and manoeuvring surfaces accounts for 3 tracked awards worth £28m in the period we monitor. The average award here is £9.3m. Construction work for airfields, runways and manoeuvring surfaces is procured mainly by MINISTRY OF DEFENCE. The biggest spender is MINISTRY OF DEFENCE, with 3 awards totalling £28m. Only 0% of awards go to SMBs, so this category is dominated by larger suppliers.

Who is buying in Construction work for airfields, runways and manoeuvring surfaces

Biggest single award

£23m

RAF Brize Norton AOS - RIBA W/S 4 - Design Contract

Won by VOLKERFITZPATRICK LIMITED on 23 Sept 2025

Busiest month

Sept 25

3 awards published, totalling £28m.

Where the awards land

  • 100%

Top suppliers

Who is winning the work

VOLKERFITZPATRICK LIMITED

1 award · £23m total

LAGAN CONSTRUCTION LIMITED

1 award · £3.8m total

Aecom

1 award · £1.1m total

Related buyers

The buyers driving demand in Construction work for airfields, runways and manoeuvring surfaces.

How Bidwell helps

Win more of the Construction work for airfields, runways and manoeuvring surfaces pipeline

SMB share in Construction work for airfields, runways and manoeuvring surfaces sits at 0%, below the wider public-sector average. The category gets won by the systems integrators with full bid teams, and that is exactly the gap Bidwell closes. We catch every UK tender that maps to Construction work for airfields, runways and manoeuvring surfaces, score it against your knowledge base, and draft a tailored response in around 30 minutes so a smaller team can compete on volume.

Start 7-day free trial →
Bidwell

Stop spending weeks on paperwork.

Set up takes 15 minutes. First tender draft inside the hour.

No credit card. Cancel any time. From £15 per month.